Now part of the Jayden's Mechanical family

Listed Service Area

Planning Furnace, Heat Pump or Fireplace Work in Zurich, Bluewater

Zurich is a former village in the Municipality of Bluewater, and both the municipal office at 14 Mill Avenue and 23 Goshen St. North, where building permit fees can be paid in person, are in the village. Zurich treats its own sewage at a lagoon facility that discharges to the Zurich Drain, gave up its two wells for Lake Huron water in 2023, and gets Festival Hydro electricity within its former village limits and at a few listed addresses outside them.

Municipality of Bluewater

Local Facts for Zurich

Checked October 30, 2026 against the linked public sources. Programs, permit rules and utility details change, so confirm the current version before relying on them.

Municipality
Bluewater was formed in 2001 from the amalgamated Villages of Hensall, Zurich and Bayfield and the former Townships of Hay and Stanley. The Municipality of Bluewater's office is at 14 Mill Avenue, Zurich.
Source: Municipality of Bluewater, Living in Bluewater
Building permits
Applied for and tracked through Cloudpermit, where inspections can also be requested. The Municipality's examples of work that needs a building permit include installing a wood burning stove or fireplace and do not name furnaces, air conditioners or heat pumps; it says the list is not exhaustive and that the property owner is responsible for determining whether a permit is required. The drawings required with an application include an HVAC drawing showing duct design with heat loss calculations and furnace and air conditioner sizing, if applicable. Fees can be paid at 23 Goshen St. North in Zurich, by mail, or by card through Cloudpermit.
Source: Municipality of Bluewater, Building Permits
Drinking water
Until February 2023 the Zurich Drinking Water System drew from two wells and served about 966 people. It then switched to water from the Lake Huron Primary Water Supply System through the Hensall distribution system, the wells were decommissioned in September 2023, and the Ministry of the Environment, Conservation and Parks combined the two systems into the Hensall-Zurich Distribution System in November 2023.
Source: Ontario Clean Water Agency for the Municipality of Bluewater, Zurich Drinking Water System 2023 Annual Water Report (PDF)
Sewage
Zurich has its own sewage treatment facility at Lot 19, Concession 10, rated at 495 cubic metres a day, with four lagoon cells, two of them aerated, and intermittent sand filters. Sewage reaches it by gravity and through the Knell Crescent and Zurich Main pumping stations, and treated effluent is discharged to the Zurich Drain.
Source: Ontario Clean Water Agency for the Municipality of Bluewater, Zurich Sewage Treatment Facility and Collection System 2025 Annual Performance Report (PDF)
Electricity
Festival Hydro's distribution licence, ED-2002-0513, covers the former Village of Zurich as of September 1998, plus a few listed customers outside the village boundary: the ball diamond at 23 East Street, and residential customers and a bowling alley on Hensall Road.
Source: Festival Hydro Inc., Electricity Distribution Licence, Schedule 1 (PDF)
Natural gas
On November 18, 2021, the Ontario Energy Board approved, under file EB-2021-0253, the renewal of Enbridge Gas Inc.'s natural gas franchise agreement with the Municipality of Bluewater for a twenty-year term. The decision notes that Enbridge Gas also holds a certificate of public convenience and necessity for the Municipality of Bluewater.
Source: Ontario Energy Board, Decision and Order EB-2021-0253, Enbridge Gas franchise renewal with the Municipality of Bluewater (PDF)

Get a Free Quote

Tell us about your heating or cooling issue.

Preparing the secure request form. If it stays unavailable, email contact@exeterheatingcooling.ca with your request.

Please enter your name.
Enter a valid phone number with at least 10 digits.
Enter a valid email address.
Enter the property city.
Enter a valid Canadian postal code.
Tell us briefly what you need.
Property Planning

What to Check for a Zurich Property

01

Ask Development Services first, and agree who books each inspection

Bluewater's permit examples name installing a wood burning stove or fireplace but not furnace, air conditioner or heat pump work, and the Municipality leaves it to the owner to determine whether a permit is needed. Before work starts, ask the provider to send Development Services a short summary of the job and the property address, or do it yourself, and agree who will apply through Cloudpermit. Fees can be paid in the village at 23 Goshen St. North, by mail, or by card through Cloudpermit. The permit holder must notify the Building Department 48 hours before each required inspection, which for a house includes substantial completion of framing and of ductwork and piping for heating and air conditioning. Electrical work is permitted separately by ESA, and a Licensed Electrical Contractor should file that permit.

02

Village water and sewer, or a private well and septic system

Properties on the Zurich water line have received treated Lake Huron water since 2023, when the village wells were decommissioned, and Zurich's sewers drain to its own lagoon facility. The Municipality publishes a hardness of 107 mg/L for that Lake Huron supply as of January 23, 2023, so mention it if the job involves a boiler, humidifier or water heater. A property outside the serviced area may use a private well or septic system, and Bluewater requires a septic permit to install, repair or alter a sewage system or replace a tank. Tell the provider which applies before a trench, ground loop or gas line is planned: Enbridge Gas locates all buried services first and checks inside the home that a new gas line will not interfere with the sewer connection.

03

Festival Hydro limits, Enbridge gas connections and heat pump rebates

Festival Hydro's licence covers the former Village of Zurich as of September 1998 and also lists the ball diamond at 23 East Street and some homes and a bowling alley on Hensall Road outside that boundary, so other properties outside it should check their bill. Natural gas in Bluewater is Enbridge Gas's franchise, renewed for twenty years by the Ontario Energy Board in 2021. Enbridge notes a September 1 application cutoff for installation in the same construction season, has your heating contractor apply for the service, and advises keeping old equipment connected until its inspector activates the new service. A Home Renovation Savings heat pump rebate needs pre-approval before installation, and the program lists Enbridge Gas customers heating mainly with a gas furnace or boiler, and homes on the Ontario grid heated with electricity, oil, propane or wood.

Before You Submit

Details to Include in the Request

  • The street address and postal code, whether it is inside the former village of Zurich or out on a road such as Hensall Road, and which electricity distributor bills you.
  • Whether the property is connected to the Zurich water line and municipal sewer, or uses a private well and a septic system.
  • The heating fuel and equipment in the house now, such as propane, oil or natural gas, a furnace, boiler, heat pump, or wood stove, roughly how old it is, and the work you want done.
  • For a new wood stove or fireplace, where it will go and how it will be vented, since Bluewater lists that installation as building permit work.
  • If you want to switch to natural gas, whether a main runs along your street, and whether an Enbridge Gas application has been made and, if so, whether it went in before September 1.
  • Any Bluewater building permit number or Home Renovation Savings pre-approval already in place, and who will request inspections.
Get A Free Quote

Confirm before work is agreed

Zurich is listed in the configured service area, which is not confirmed coverage. Your request is shared with a service provider for review. Before work is agreed, confirm with the provider that they cover the property, when the work can be done, and that they hold the qualifications the work requires. A request does not book a visit or an emergency response.

Related Services

Service Guidance for Zurich Requests

References

Sources for Zurich

Facts checked October 30, 2026. Confirm current program, permit and utility details with the source before relying on them.

Request work for your Zurich property

Send the property location, equipment information, and requested work for review.

Get A Free Quote